Orica feeling Burrup pain

Orica feeling Burrup pain

Heat exchangers the main cause of the Burrup TAN plant problems.

Maintenance

14 JUN 2018
Bigger mining asset management player created

Bigger mining asset management player created

Chasing increased mining opportunities.

Maintenance

13 JUN 2018
Dozer offers better 'office'

Dozer offers better 'office'

Cab easier to get in and out of and engine more efficient.

Fleet

07 JUN 2018
Safety shafted at Lightning Ridge

Safety shafted at Lightning Ridge

Three recent incidents at the Lightning Ridge opal fields in New South Wales prompt safety call.

Sustainability

06 JUN 2018
Future of mining - how ABB technology is enabling miners' digital transformation
Future of mining - how ABB technology is enabling miners' digital transformation
Future of mining - how ABB technology is enabling miners' digital transformation

Future of mining - how ABB technology is

Find out how to stay competitive and create a digitally enabled mine

SPONSORED

abb

Murray builds big pump-set pipeline
Murray builds big pump-set pipeline
Murray builds big pump-set pipeline

Murray builds big pump-set pipeline

Murray Engineering Pump Sets a big hit so far with their performance and low maintenance

SPONSORED

murray engineering

Mine optimisation
Mine optimisation
Mine optimisation

Mine optimisation

Improve productivity, reduce downtime and protect your workforce with ABB

SPONSORED

abb

Queensland's first MD6250 Drill delivered by Hastings Deering
Queensland's first MD6250 Drill delivered by Hastings Deering
Queensland's first MD6250 Drill delivered by Hastings Deering

Queensland's first MD6250 Drill delivered

Cat® MD6250 rotary blasthole drill for contractor Mining and Civil Australia

SPONSORED

hastings deering

Rock falls put squeeze on Super Pit jobs

Rock falls put squeeze on Super Pit jobs

Job losses foreshadowed by KCGM after two rock falls at the Super Pit in Kalgoorlie, WA.

Maintenance

31 MAY 2018
Kanmantoo crushing it again

Kanmantoo crushing it again

The primary crusher is working again at the Kanmantoo mine.

Plant

25 MAY 2018
Emerson gets the measure on calibration flow

Emerson gets the measure on calibration flow

Provides better support for flow meter users.

Maintenance

18 MAY 2018
Kanmantoo crusher grinds to a halt after bearing failure

Kanmantoo crusher grinds to a halt after bearing failure

Mechanical failure of the crusher causes work to stop at the Kanmantoo copper mine in SA.

Maintenance

17 MAY 2018
Fortescue Metals Group secure rental of new Liebherr R 996B Excavator
Fortescue Metals Group secure rental of new Liebherr R 996B Excavator
Fortescue Metals Group secure rental of new Liebherr R 996B Excavator

Fortescue Metals Group secure rental of new

National Plant & Equipment have purchased two Liebherr R 996B Excavator's

SPONSORED

national group

Expert insights into over 20 years of apron feeder evolution
Expert insights into over 20 years of apron feeder evolution
Expert insights into over 20 years of apron feeder evolution

Expert insights into over 20 years of apron

With 37 years in the mining industry, Product Specialist Thomas Thomas shares some insights

SPONSORED

metso

Murray pushes further into mine control market
Murray pushes further into mine control market
Murray pushes further into mine control market

Murray pushes further into mine control market

State-of-the-art control system makes dozer operation more productive, safer

SPONSORED

murray engineering

Visualising O&M inspection data in 3D
Visualising O&M inspection data in 3D
Visualising O&M inspection data in 3D

Visualising O&M inspection data in 3D

Future of Mining 2019

SPONSORED

redeye apps

The future of maintenance has arrived
The future of maintenance has arrived
The future of maintenance has arrived

The future of maintenance has arrived

Dingo's new Trakka predictive analytics

SPONSORED

dingo

National Group's Port-to-Pit Approach
National Group's Port-to-Pit Approach
National Group's Port-to-Pit Approach

National Group's Port-to-Pit Approach

Take a behind the scenes look at how we get these massive mining machines from port-to-pit.

SPONSORED

national group

Optimising blast designs to improve project outcomes
Optimising blast designs to improve project outcomes
Optimising blast designs to improve project outcomes

Optimising blast designs to improve project

JSW's specialist knowledge is helping to reduce project costs and improve timeframes

SPONSORED

jsw australia

High-quality crusher plants made for your business
High-quality crusher plants made for your business
High-quality crusher plants made for your business

High-quality crusher plants made for your

Three exciting new ways to purchase crushing & screening plants

SPONSORED

sandvik

Murray backs Shalom House 'rules'
Murray backs Shalom House 'rules'
Murray backs Shalom House 'rules'

Murray backs Shalom House 'rules'

Rehabilitation centre lauded for 'tough love'

SPONSORED

murray engineering

Safety, training, production optimisation in heavy industry
Safety, training, production optimisation in heavy industry
Safety, training, production optimisation in heavy industry

Safety, training, production optimisation

A robust training program will keep the safety of those conducting tasks.

Improving Haul Road Conditions: 'You See an Immediate Effect'
Improving Haul Road Conditions: 'You See an Immediate Effect'
Improving Haul Road Conditions: 'You See an Immediate Effect'

Improving Haul Road Conditions: 'You See

How maintenance and operator awareness can go a long way in extending tyre life.

SPONSORED

kal tire

Liebherr becomes Certified Fumigation Site for Brown Marmorated Stink Bug
Liebherr becomes Certified Fumigation Site for Brown Marmorated Stink Bug
Liebherr becomes Certified Fumigation Site for Brown Marmorated Stink Bug

Liebherr becomes Certified Fumigation Site

Liebherr-Australia has worked with the Department of Agriculture and Water Resources (DAWR)

Taking the pulse to get optimal tool stress

Taking the pulse to get optimal tool stress

Device monitor top-hammer drilling tool stress in real time.

MACA adds SMP projects

MACA adds SMP projects

SMP projects won at Degrussa and Savannah.

Maintenance

08 MAY 2018
Getting safer lifting from an old friend

Getting safer lifting from an old friend

Assessment improves crane safety and operations.

Maintenance

07 MAY 2018
Orica hit by operational issues

Orica hit by operational issues

Burrup TAN plant core to Orica's issues.

Maintenance

07 MAY 2018
Port pinch bites BHP iron ore flow

Port pinch bites BHP iron ore flow

Aims to hit 290Mtpa at Port Hedland next year.

Logistics

20 APR 2018
A 200% belt life increase

A 200% belt life increase

Stopped ripping issue on front-end conveyor.

Maintenance

18 APR 2018
Changing demands of equipment maintenance

Changing demands of equipment maintenance

Maintenance shift has benefits and downsides.

Maintenance

16 APR 2018
Morning Star rises for Austar

Morning Star rises for Austar

Plant refurbishment completed.

Maintenance

13 APR 2018
Future of mining - how ABB technology is enabling miners' digital transformation
Future of mining - how ABB technology is enabling miners' digital transformation
Future of mining - how ABB technology is enabling miners' digital transformation

Future of mining - how ABB technology is

Find out how to stay competitive and create a digitally enabled mine

SPONSORED

abb

Murray builds big pump-set pipeline
Murray builds big pump-set pipeline
Murray builds big pump-set pipeline

Murray builds big pump-set pipeline

Murray Engineering Pump Sets a big hit so far with their performance and low maintenance

SPONSORED

murray engineering

Mine optimisation
Mine optimisation
Mine optimisation

Mine optimisation

Improve productivity, reduce downtime and protect your workforce with ABB

SPONSORED

abb

Queensland's first MD6250 Drill delivered by Hastings Deering
Queensland's first MD6250 Drill delivered by Hastings Deering
Queensland's first MD6250 Drill delivered by Hastings Deering

Queensland's first MD6250 Drill delivered

Cat® MD6250 rotary blasthole drill for contractor Mining and Civil Australia

SPONSORED

hastings deering

Fortescue Metals Group secure rental of new Liebherr R 996B Excavator
Fortescue Metals Group secure rental of new Liebherr R 996B Excavator
Fortescue Metals Group secure rental of new Liebherr R 996B Excavator

Fortescue Metals Group secure rental of new

National Plant & Equipment have purchased two Liebherr R 996B Excavator's

SPONSORED

national group

Expert insights into over 20 years of apron feeder evolution
Expert insights into over 20 years of apron feeder evolution
Expert insights into over 20 years of apron feeder evolution

Expert insights into over 20 years of apron

With 37 years in the mining industry, Product Specialist Thomas Thomas shares some insights

SPONSORED

metso

Murray pushes further into mine control market
Murray pushes further into mine control market
Murray pushes further into mine control market

Murray pushes further into mine control market

State-of-the-art control system makes dozer operation more productive, safer

SPONSORED

murray engineering

Visualising O&M inspection data in 3D
Visualising O&M inspection data in 3D
Visualising O&M inspection data in 3D

Visualising O&M inspection data in 3D

Future of Mining 2019

SPONSORED

redeye apps

The future of maintenance has arrived
The future of maintenance has arrived
The future of maintenance has arrived

The future of maintenance has arrived

Dingo's new Trakka predictive analytics

SPONSORED

dingo

National Group's Port-to-Pit Approach
National Group's Port-to-Pit Approach
National Group's Port-to-Pit Approach

National Group's Port-to-Pit Approach

Take a behind the scenes look at how we get these massive mining machines from port-to-pit.

SPONSORED

national group

Optimising blast designs to improve project outcomes
Optimising blast designs to improve project outcomes
Optimising blast designs to improve project outcomes

Optimising blast designs to improve project

JSW's specialist knowledge is helping to reduce project costs and improve timeframes

SPONSORED

jsw australia

High-quality crusher plants made for your business
High-quality crusher plants made for your business
High-quality crusher plants made for your business

High-quality crusher plants made for your

Three exciting new ways to purchase crushing & screening plants

SPONSORED

sandvik

Murray backs Shalom House 'rules'
Murray backs Shalom House 'rules'
Murray backs Shalom House 'rules'

Murray backs Shalom House 'rules'

Rehabilitation centre lauded for 'tough love'

SPONSORED

murray engineering

Safety, training, production optimisation in heavy industry
Safety, training, production optimisation in heavy industry
Safety, training, production optimisation in heavy industry

Safety, training, production optimisation

A robust training program will keep the safety of those conducting tasks.

Improving Haul Road Conditions: 'You See an Immediate Effect'
Improving Haul Road Conditions: 'You See an Immediate Effect'
Improving Haul Road Conditions: 'You See an Immediate Effect'

Improving Haul Road Conditions: 'You See

How maintenance and operator awareness can go a long way in extending tyre life.

SPONSORED

kal tire

Liebherr becomes Certified Fumigation Site for Brown Marmorated Stink Bug
Liebherr becomes Certified Fumigation Site for Brown Marmorated Stink Bug
Liebherr becomes Certified Fumigation Site for Brown Marmorated Stink Bug

Liebherr becomes Certified Fumigation Site

Liebherr-Australia has worked with the Department of Agriculture and Water Resources (DAWR)

Explore the Future of Mining Channel - real insight into the catalysts and trends changing mining's future.