PROCESSING

Moranbah North upgrades pumping system

JENNCHEM has completed an extensive campaign at Anglo American's Moranbah North mine in Queensland utilising its newly upgraded surface to underground pumping system.

Jennchem's pumpable crib campaign at Moranbah North recognised installation rates of more than eight pumpable cribs per hour

Jennchem's pumpable crib campaign at Moranbah North recognised installation rates of more than eight pumpable cribs per hour

The project was made up of backfilling 7.3 million litres of crossdrive and the installation of two 20psi longwall seals and 400 pumpable cribs. Backfilling of longwall 605's block crossdrive used Jennchem's...

Start a free trial to continue reading this article
Already have an account?  
Subscribe now

A growing series of reports, each focused on a key discussion point for the mining sector, brought to you by the Mining Monthly Intelligence team.

A growing series of reports, each focused on a key discussion point for the mining sector, brought to you by the Mining Monthly Intelligence team.

editions

Mining Magazine Intelligence Future Fleets Report 2024

The report paints a picture of the equipment landscape and includes detailed profiles of mines that are employing these fleets

editions

Mining Magazine Intelligence Digitalisation Report 2023

An in-depth review of operations that use digitalisation technology to drive improvements across all areas of mining production

editions

Mining Magazine Intelligence Automation Report 2023

An in-depth review of operations using autonomous solutions in every region and sector, including analysis of the factors driving investment decisions

editions

Mining Magazine Intelligence Exploration Report 2023 (feat. Opaxe data)

A comprehensive review of current exploration rates, trending exploration technologies, a ranking of top drill intercepts and a catalogue of 2022 Initial Resource Estimates and recent discovery successes.