Tritton's water woes wane

Tritton's water woes wane

Copper production guidance for 2021 is 23,500-24,500t at a capital cost of $2.80 to $2.95/lb.

Sandfire shuffle

Sandfire shuffle

Sandfire gearing for global moves.

Sustainability

01 JULY 2020
Liontown tails wag

Liontown tails wag

The tailings were processed through the Thalanga mill.

Inspecting plants in a time of coronavirus

Inspecting plants in a time of coronavirus

Remote survey option created.

Tritton in frame for truck fire

Tritton in frame for truck fire

Tritton has been listed to appear in the NSW District Court on August 3.

Sustainability

22 JUNE 2020
Deflector deal for GRES

Deflector deal for GRES

LoI marks GRES' first major works at Deflector.

Design / Build

19 JUNE 2020
OZ Minerals signs Whyalla port contract

OZ Minerals signs Whyalla port contract

Port to be used to ship Carrapateena copper concentrate.

Transport

16 JUNE 2020
Nifty result from scoping study

Nifty result from scoping study

Open pit seems better option than restarting underground operation.

Development

11 JUNE 2020
WA wants eastern states FIFO workers to stay

WA wants eastern states FIFO workers to stay

Sweeteners on offer including Building Bonus grants and mortgage assistance.

Logistics

09 JUNE 2020
Tritton truck fire probed

Tritton truck fire probed

An overfilled fuel tank believed to be part of the cause of a 2018 fire.

Maintenance

05 JUNE 2020
Regional apprentices sought

Regional apprentices sought

Glencore keen to welcome new crop of apprentices.

Investment

02 JUNE 2020
Havilah looking at rare earth bonus

Havilah looking at rare earth bonus

Research to determine whether rare earths can be recovered as a by-product.

Design / Build

01 JUNE 2020