Kestrel helps Rio production fly in 2016

RIO Tinto’s share of hard coking coal production for 2016 was slightly above the top end of the guidance range due to strong operational performance, while semi-soft coking and thermal coal production of 21.4 million tonnes was in line with expectations.

sponsored-logo
Kestrel helps Rio production fly in 2016 Kestrel helps Rio production fly in 2016 Kestrel helps Rio production fly in 2016 Kestrel helps Rio production fly in 2016 Kestrel helps Rio production fly in 2016

Hard coking coal production was 4% higher in 2016 at 8.

loader