The re-entry phase marks the second stage of the PRRA's planned objectives.
26 May 2019
The 2.3km drift tunnel had been sealed 30m from the portal entrance since November 2016.
22 May 2019
The agency was focused on fixing the borehole 51 issue and checking the integrity of gas monitoring.
09 May 2019
The agency's risk assessment process identified risks and control measures concerning entrapment.
20 March 2019
The re-entry will only take place if all the necessary pre-conditions have been met.
12 March 2019
The venturi will be flown by helicopter to the borehole site in three parts and reassembled on site.
21 January 2019
Re-entry into the mine mooted for next March.
25 October 2018
Buzzing Perth roundtable picks the brains of sector leaders to help shape the resources
From flight schedules to emergency alerts, new screen-based platform Swift TV is helping mining companies better reach workers
THE BEST GET BETTER: the new Nexsys system
Boosting pipeline lifespan, cutting energy use, and lowering emissions in modern
The ESG Index provides an in-depth evaluation of the ESG performance of 60+ of the world’s largest mining companies. It assesses companies across 10 weighted indicators within 6 essential ESG pillars.
Discover how mining companies and investors are adopting, deploying and evaluating new technologies.
Gain exclusive insights into the world of exploration in a comprehensive review of the top trending technologies, intercepts, discoveries and more.
Mining IQ Future Fleets Insights 2025 looks at how companies are using alternative energy sources to cut greenhouse gas emmissions