With the move to Isaac Downs, lower strip ratios and higher-ranking coking coals are forecast.
29 September 2021
There was a downsizing of fleet size to control costs from the challenging market conditions.
03 September 2021
Involves transitioning from surface to underground operations.
29 August 2021
The quarterly RoM strip ratio was 9.2 compared to 11.1 in June 2020.
28 July 2021
Project has all the approvals needed to allow construction and mining to start.
27 July 2021
The project will have a total production of 13.9Mt of metallurgical coal during its lifetime.
14 July 2021
The trial project is expected to reduce greenhouse gas emissions from Blues' activities.
22 June 2021
The EIS assessment report has been published in March this year.
31 May 2021
The underground mapping specialist explores new ways to map the inaccessible
SRK is working to consider dewatered tailings management technology as a risk reduction
Dyno Nobel’s digital advancements bring a new era of secure underground blasting
The Karratha Service Centre specialises in delivering OEM-quality repairs and refurbishments
The report paints a picture of the equipment landscape and includes detailed profiles of mines that are employing these fleets
An in-depth review of operations that use digitalisation technology to drive improvements across all areas of mining production
An in-depth review of operations using autonomous solutions in every region and sector, including analysis of the factors driving investment decisions
A comprehensive review of current exploration rates, trending exploration technologies, a ranking of top drill intercepts and a catalogue of 2022 Initial Resource Estimates and recent discovery successes.