As part of the supply contract Longwall Hydraulics installed an on-site power package capable of 3300V, to enable full high voltage functional acceptance testing of the pump station package.
One-stop publication for operational excellence and intelligence within the METS sector
Combine the power of industry news and research with an Australia's Mining Monthly Premium subscription. Includes Mining Magazine Intelligence.