Gekko in box seat for King Island job

MINERAL processing specialist Gekko Systems has completed an engineering study to design and cost a processing plant capable of treating ore from King Island Scheelite’s proposed Dolphin tungsten mine on King Island and is negotiating terms with the miner.

Gekko in box seat for King Island job Gekko in box seat for King Island job Gekko in box seat for King Island job Gekko in box seat for King Island job Gekko in box seat for King Island job

The Dolphin mine pit on King Island.

Gekko completed the study in December with costings to an accuracy of +/-10% as requested and the costs it came up where in KIS' ball park.