PROCESSING

Transmin lands South Flank contracts

BULK materials handling specialist Transmin has won three contracts, together worth about $20 million, on BHP’s South Flank iron ore project in Western Australia’s Pilbara region.

The LPF Transmin provided at Mining Area C in a reclaim hopper configuration.

The LPF Transmin provided at Mining Area C in a reclaim hopper configuration.

The three packages are for the design and supply of equipment for two parts on the South Flank plant: Inflow and the Ore Handling Plant. The packages are two heavy duty Transmin BoomerHD rock breakers...

Start a free trial to continue reading this article
Already have an account?  
Subscribe now

A growing series of reports, each focused on a key discussion point for the mining sector, brought to you by the Mining Monthly Intelligence team.

A growing series of reports, each focused on a key discussion point for the mining sector, brought to you by the Mining Monthly Intelligence team.

editions

Mining Magazine Intelligence Future Fleets Report 2024

The report paints a picture of the equipment landscape and includes detailed profiles of mines that are employing these fleets

editions

Mining Magazine Intelligence Digitalisation Report 2023

An in-depth review of operations that use digitalisation technology to drive improvements across all areas of mining production

editions

Mining Magazine Intelligence Automation Report 2023

An in-depth review of operations using autonomous solutions in every region and sector, including analysis of the factors driving investment decisions

editions

Mining Magazine Intelligence Exploration Report 2023 (feat. Opaxe data)

A comprehensive review of current exploration rates, trending exploration technologies, a ranking of top drill intercepts and a catalogue of 2022 Initial Resource Estimates and recent discovery successes.