PROCESSING

Bechtel to review Latrobe plant

US ENGINEERING firm Bechtel is to conduct the pre-feasibility study on Latrobe Magnesium’s planned 100,000 tonne per annum magnesium plant to look at strategic options to leverage and develop the plant at an overseas location.

 Site of planned plant

Site of planned plant

Latrobe is building a 1000tpa demonstration plant to convert fly ash into magnesium metal, supplementary cementitious material, amorphous silica, char and iron oxide, using ferronickel slag as feedstock....

Start a free trial to continue reading this article
Already have an account?  
Subscribe now
MORE ON THIS TOPIC

A growing series of reports, each focused on a key discussion point for the mining sector, brought to you by the Mining Monthly Intelligence team.

A growing series of reports, each focused on a key discussion point for the mining sector, brought to you by the Mining Monthly Intelligence team.

editions

Mining Magazine Intelligence Future Fleets Report 2024

The report paints a picture of the equipment landscape and includes detailed profiles of mines that are employing these fleets

editions

Mining Magazine Intelligence Digitalisation Report 2023

An in-depth review of operations that use digitalisation technology to drive improvements across all areas of mining production

editions

Mining Magazine Intelligence Automation Report 2023

An in-depth review of operations using autonomous solutions in every region and sector, including analysis of the factors driving investment decisions

editions

Mining Magazine Intelligence Exploration Report 2023 (feat. Opaxe data)

A comprehensive review of current exploration rates, trending exploration technologies, a ranking of top drill intercepts and a catalogue of 2022 Initial Resource Estimates and recent discovery successes.