Sedgman at work in British Columbia

CIMIC Group’s mineral processing specialist Sedgman has secured an engineering, procurement and construction contract with Canadian miner Artemis Gold at the Blackwater gold mine in British Columbia, worth about $357.32 million.

Sedgman at work in British Columbia Sedgman at work in British Columbia Sedgman at work in British Columbia Sedgman at work in British Columbia Sedgman at work in British Columbia

Blackwater gold mine in Canada

Under the contract scope Sedgman will design and build a 6 million tonne per annum carbon-in-leach gold plant plus other processing and non-processing infrastructure, for Artemis.