Pilot Lake Mackay pond trial continues

A PILOT evaporation trial at Agrimin’s remote Mackay potash project on the Western Australia and Northern Territory border has captured a full annual cycle of operating data, with results validating the definitive feasibility study pond model and process assumptions.

Pilot Lake Mackay pond trial continues Pilot Lake Mackay pond trial continues Pilot Lake Mackay pond trial continues Pilot Lake Mackay pond trial continues Pilot Lake Mackay pond trial continues

Lake Mackay pilot evaporation trial in progress

As part of the long-term pilot evaporation trial Agrimin is monitoring a 3000sq.m pond system running constant flow operations, with brine moved through the ponds daily.