Half time at Beyondie

THE Beyondie sulphate of potash project in Western Australia’s Pilbara has reached the halfway point in its development, with owner Kalium Lakes announcing the project is ahead of schedule.

Half time at Beyondie Half time at Beyondie Half time at Beyondie Half time at Beyondie Half time at Beyondie

Trenching works on Sunshine Lake with Kalium Lakes director and founder Brent Smoothy (left) and chairman Mal Randal.

The sub-surface brine deposit 160km east of Newman will support a 90,000 tonne per annum SoP operation that will rapidly ramp up to 180,000tpa over a 30-year life-of-mine.