BCC upgrades Isaac River with inclusion of Vermont Upper seam

BOWEN Coking Coal has upgraded its Isaac River Coking Coal project’s total resources figure after drilling to confirm the existence of its Vermont Upper seam.

sponsored-logo
BCC upgrades Isaac River with inclusion of Vermont Upper seam BCC upgrades Isaac River with inclusion of Vermont Upper seam BCC upgrades Isaac River with inclusion of Vermont Upper seam BCC upgrades Isaac River with inclusion of Vermont Upper seam BCC upgrades Isaac River with inclusion of Vermont Upper seam

The company's total coal resource is now estimated at 8.7 million tonnes, of which 8.35Mt is classified as measured and indicated, with the Vermont Upper seam estimated to be 3.

  • FREE coverage on the rapidly developing coronavirus pandemic. Visit our COVID-19 hub.
  • Latest COVID-19 Coverage: Pandemic no impediment. Read more.
  • Latest COVID-19 Coverage: Like sand through the hourglass. Read more