INTERNATIONAL COAL NEWS

Integra could face production suspension

PRODUCTION from Vale's troubled Integra underground mine may be suspended if the company is denie...

Lou Caruana

This article is 13 years old. Images might not display.

The mine is seeking a modification to a condition that stipulates the use of an overland conveyor to transport coal from the underground surface facilities to the Camberwell Coal Handling and Preparation Plant.

“Studies have indicated that the overland conveyor required under Condition 48 is not economically viable and its construction would result in significant disruption to existing operations, with only minimal environmental benefits,” according to its environmental assessment.

“Extension to the timeframe stipulated in Condition 48 for the installation and construction of the conveyor will allow a robust assessment of, and consultation on, the potential impacts associated with its removal from the project approvals.”

It will also enable a detailed study of potential additional dust amelioration measures to be implemented in this area for underground coal haulage, the EA states.

“Further investigations into the potential construction and operation of the conveyor will also be continued during this period. The potential removal of this condition will be the subject of a separate application. If an extension to the timeframe is not granted and trucking is required to cease then production of coal from the underground operations would be suspended resulting in the loss of employment for underground workers.”

Integra, which consists of an open cut and underground mine, is waiting on the department to approve extensions of its north open cut mine and the placement of waste rock which also has the potential to suspend production.

A recent study of the volume of waste rock to be produced and the approved emplacement strategy for the north open cut identified a “significant deficiency in emplacement capacity”

While a shortâ€Âterm dumping strategy would address this deficiency, without resolution, the capacity constraints will significantly impact the efficient development of the pit, and ultimately, cause mine operations to cease, the EA states.

TOPICS:

Expert-led Insights reports built on robust data, rigorous analysis and expert commentary covering mining Exploration, Future Fleets, Automation and Digitalisation, and ESG.

Expert-led Insights reports built on robust data, rigorous analysis and expert commentary covering mining Exploration, Future Fleets, Automation and Digitalisation, and ESG.

editions

ESG Index 2025: Benchmarking the Future of Sustainable Mining

The ESG Index provides an in-depth evaluation of the ESG performance of 60+ of the world’s largest mining companies. It assesses companies across 10 weighted indicators within 6 essential ESG pillars.

editions

Automation and Digitalisation Insights 2025

Discover how mining companies and investors are adopting, deploying and evaluating new technologies.

editions

Mining IQ Exploration Insights 2025

Gain exclusive insights into the world of exploration in a comprehensive review of the top trending technologies, intercepts, discoveries and more.

editions

Future Fleets Insights 2025

Mining IQ Future Fleets Insights 2025 looks at how companies are using alternative energy sources to cut greenhouse gas emmissions