INTERNATIONAL COAL NEWS

Plans to extend Newlands Northern by 14 years

XSTRATA Coal is seeking federal environmental approval to extend the longwall and open cut operat...

Blair Price

This article is 14 years old. Images might not display.

The project application was prepared for Xstrata by engineering giant Kellogg Brown & Root and made publicly available last week.

Underground and surface mining at Newlands, 140 kilometres west of Mackay, typically produces around 10.5 million tonnes per annum of coking and thermal coal, which is exported through Abbot Point.

Xstrata aims to extend longwall and open cut mining into a total of three mining leases to the east of existing operations.

KBR said the Northern Underground Extension project was anticipated to start in 2013 for up to 6Mpta of coal production.

“Access to the extended underground mine will be gained by connecting it to the existing mine entry for the current NUG [Newlands Northern underground mine],” KBR said.

“Mined coal will be transferred by a conveyor to the existing run-of-mine stockpile and on to the coal handling and processing plant for processing as per current arrangements.”

The proposed extension of the open cut operations, known as the Eastern Creek Extended project, will target areas within mining lease application 10352 for up to 5Mtpa of coal production.

Existing draglines and associated truck and shovel equipment will be used for mining the area, with about 3100 hectares of land expected to be disturbed.

KBR said mining in the underground extension areas was planned to start in 2013 and cover a mine life of around 14 years.

The ECE project is scheduled to start mining in 2015 and support a mine life of about 27 years.

The federal application was made to meet the requirements of the Environment Protection and Biodiversity Conservation Act.

KBR expects state environmental assessment of the two projects to be finalised by the end of 2012.

Newlands Northern was Australia’s longwall production leader in 2009 with 8.7Mt ROM output.

This mine was ranked second last year with output of 8.21Mt ROM.

TOPICS:

Expert-led Insights reports built on robust data, rigorous analysis and expert commentary covering mining Exploration, Future Fleets, Automation and Digitalisation, and ESG.

Expert-led Insights reports built on robust data, rigorous analysis and expert commentary covering mining Exploration, Future Fleets, Automation and Digitalisation, and ESG.

editions

ESG Index 2025: Benchmarking the Future of Sustainable Mining

The ESG Index provides an in-depth evaluation of the ESG performance of 60+ of the world’s largest mining companies. It assesses companies across 10 weighted indicators within 6 essential ESG pillars.

editions

Automation and Digitalisation Insights 2025

Discover how mining companies and investors are adopting, deploying and evaluating new technologies.

editions

Mining IQ Exploration Insights 2025

Gain exclusive insights into the world of exploration in a comprehensive review of the top trending technologies, intercepts, discoveries and more.

editions

Future Fleets Insights 2025

Mining IQ Future Fleets Insights 2025 looks at how companies are using alternative energy sources to cut greenhouse gas emmissions