INTERNATIONAL COAL NEWS

New Narrabri longwall production scheduled for April

FIRST production from the 400m wide longwall face at Whitehaven Coal's Narrabri mine in New South...

Lou Caruana

This article is 9 years old. Images might not display.

The company plans to extend the longwall panels from Narrabri North into Narrabri South lease, he told the 2016 Global Metals and Mining Conference.

“Drilling is scheduled in FY2017 in Narrabri South tenement to convert existing resources into reserves,” he said.

The mine permitted to produce 11 million tonnes per annum of ROM coal.

It produced 3.5Mt ROM in the first half of the FY2016 (which included a longwall move) and 8.3Mt ROM in CY2015.

FOB costs at Narrabri averaged $49/t in H1 FY2016.

TOPICS:

Expert-led Insights reports built on robust data, rigorous analysis and expert commentary covering mining Exploration, Future Fleets, Automation and Digitalisation, and ESG.

Expert-led Insights reports built on robust data, rigorous analysis and expert commentary covering mining Exploration, Future Fleets, Automation and Digitalisation, and ESG.

editions

Automation and Digitalisation Insights 2025

Discover how mining companies and investors are adopting, deploying and evaluating new technologies.

editions

Mining IQ Exploration Insights 2025

Gain exclusive insights into the world of exploration in a comprehensive review of the top trending technologies, intercepts, discoveries and more.

editions

Future Fleets Insights 2025

Mining IQ Future Fleets Insights 2025 looks at how companies are using alternative energy sources to cut greenhouse gas emmissions

editions

Automation and Digitalisation Insights 2024

Exclusive research for Mining IQ Automation and Digitalisation Insights 2024 shows mining companies are embracing cutting-edge tech