INTERNATIONAL COAL NEWS

Ferndale enters second-stage drilling

PHASE two drilling of Coalworks' Ferndale underground project in the Upper Hunter Valley has begu...

Blair Price

This article is 14 years old. Images might not display.

Of the seven widely spaced holes drilled so far, Coalworks observed that the lower split of the Piercefield seam had a 1.5-2 metre thickness between two holes more than one kilometre apart, containing medium to high ash.

In the hole near the western boundary of the exploration licence area, Coalworks said there was simple splitting which formed a thicker 3.8m coal section.

Though a 0.4m-thick stone band is also present, Coalworks aims to conduct further laboratory analysis to confirm the underground mining potential.

The Bayswater seam was found to have a potential working seam of 4.4m and medium ash content.

However, the depth was around 600m which would create significant development costs alone.

The upper Wittingham coal measures covering the Whybrow, Redbank Creek and Wambo seams start from depths of greater than 150m.

Potential working sections for these seams ranged from 1.2m to 2.49m out of the holes drilled so far.

The middle Wittingham coal measures start from depths of greater than 300m and extend down to the Bayswater seam.

Coalworks said the Wittingham coal measures contained thermal and coking coal types, suitable for export thermal, coking and pulverised coal injection coal products.

The second phase of drilling consists of nine cored holes in the northern, central and southern parts of the tenement.

Private company Boardwalk, run by Queensland entrepreneur Nathan Tinkler, is funding this drilling.

The joint venture partner will earn 50% of the Ferndale project for spending up to $25 million on a bankable feasibility study for open cut mining along with a prefeasibility study on underground mining development.

With an exploration target of 350-530 million tonnes of resources, maiden resources are expected to be revealed near the end of the September quarter.

Coalworks shares closed down 2.9% to 83c yesterday.

TOPICS:

Expert-led Insights reports built on robust data, rigorous analysis and expert commentary covering mining Exploration, Future Fleets, Automation and Digitalisation, and ESG.

Expert-led Insights reports built on robust data, rigorous analysis and expert commentary covering mining Exploration, Future Fleets, Automation and Digitalisation, and ESG.

editions

ESG Index 2025: Benchmarking the Future of Sustainable Mining

The ESG Index provides an in-depth evaluation of the ESG performance of 60+ of the world’s largest mining companies. It assesses companies across 10 weighted indicators within 6 essential ESG pillars.

editions

Automation and Digitalisation Insights 2025

Discover how mining companies and investors are adopting, deploying and evaluating new technologies.

editions

Mining IQ Exploration Insights 2025

Gain exclusive insights into the world of exploration in a comprehensive review of the top trending technologies, intercepts, discoveries and more.

editions

Future Fleets Insights 2025

Mining IQ Future Fleets Insights 2025 looks at how companies are using alternative energy sources to cut greenhouse gas emmissions