All steady on the coal front for BHP

WHILE metallurgical and thermal coal production was down for BHP in the September quarter, the company’s full-year production guidance remains unchanged.

sponsored-logo
All steady on the coal front for BHP All steady on the coal front for BHP All steady on the coal front for BHP All steady on the coal front for BHP All steady on the coal front for BHP

A longwall move at Broadmeadow is scheduled for the December quarter.

Metallurgical coal production was down 2% to 10 million tonnes for the quarter.

Guidance remains unchanged at between 43Mt and 46Mt with volumes weighted to the second half of the year.