Tritton's water woes wane

BRISBANE-based Aeris Resources has put the long, hot, dry summer behind it with copper production at the Tritton copper mine in New South Wales up 2% on previously announced guidance, at 25,041 tonnes for FY2020.

Tritton's water woes wane Tritton's water woes wane Tritton's water woes wane Tritton's water woes wane Tritton's water woes wane

The Tritton mine in NSW

Aeris Resources executive chairman Andre Labuschagne said it was a fantastic result, considering Tritton's operations were materially impacted by water availability and water quality issues during the