Granny Smith gets the hybrid power

POWER provider Aggreko is building a hybrid power station on Western Australia’s Granny Smith gold mine, for operator Gold Fields.

Granny Smith gets the hybrid power Granny Smith gets the hybrid power Granny Smith gets the hybrid power Granny Smith gets the hybrid power Granny Smith gets the hybrid power

Aggreko load testing at the Granny Smith site

As part of the renewable energy and battery storage plan Aggreko will provide 7.3 megawatts of solar power generation, as well as a 2MW/1 megawatt hours battery system.

  • FREE coverage on the rapidly developing coronavirus pandemic. Visit our COVID-19 hub.
  • Latest COVID-19 Coverage: Pandemic no impediment. Read more.
  • Latest COVID-19 Coverage: Like sand through the hourglass. Read more

Most read Infrastructure