Floods put dampener on Whitehaven production forecast

WHITEHAVEN Coal has lowered its annual production guidance after flooding in New South Wales and a slower than expected ramp-up of production at Narrabri mine because of geotechnical issues.

Floods put dampener on Whitehaven production forecast Floods put dampener on Whitehaven production forecast Floods put dampener on Whitehaven production forecast Floods put dampener on Whitehaven production forecast Floods put dampener on Whitehaven production forecast

A structural assessment of NICG’s shiploader SL1 identified faults requiring an expected period of two weeks to be repaired.

This updated guidance includes a narrowing of run-of-mine coal production ranges and a reduction in managed coal sales because the Newcastle Coal Infrastructure Group also reported bad news for the