The electrician was conducting a "test for dead" check before replacing the damaged contactor and overload fuse that were feeding a 415V three-phase pump circuit.
One-stop publication for operational excellence and intelligence within the METS sector
Combine the power of industry news and research with an Australia's Mining Monthly Premium subscription. Includes Mining Magazine Intelligence.