The Gekko plant only needs two operators
21 February 2024
Acquisition set to save Vertex at least $4M
02 February 2024
Classic's flagship mine in WA Goldfields has strong grades
29 June 2023
The Gekko gold processing plant was moved onto its cured foundations earlier this week
15 March 2023
About 10 construction and 50 ongoing jobs will be available at Kat Gap.
16 November 2022
The pilot plant was run at 1tph during the tests.
29 September 2022
The delay is matched by a big rise in freight costs.
17 August 2021
The bulk sample is expected to yield about 1000oz of gold.
11 August 2021
The underground mapping specialist explores new ways to map the inaccessible
SRK is working to consider dewatered tailings management technology as a risk reduction
Dyno Nobel’s digital advancements bring a new era of secure underground blasting
The Karratha Service Centre specialises in delivering OEM-quality repairs and refurbishments
The report paints a picture of the equipment landscape and includes detailed profiles of mines that are employing these fleets
An in-depth review of operations that use digitalisation technology to drive improvements across all areas of mining production
An in-depth review of operations using autonomous solutions in every region and sector, including analysis of the factors driving investment decisions
A comprehensive review of current exploration rates, trending exploration technologies, a ranking of top drill intercepts and a catalogue of 2022 Initial Resource Estimates and recent discovery successes.