L-Max completes 10-day trial

L-Max completes 10-day trial

Filter cloths performed better than expected.

Design / Build

29 JULY 2019
Wrong cloth shuts down plant

Wrong cloth shuts down plant

Lepidico's plant grinds to a halt earlier than expected as wrong cloth uncovered.

Design / Build

01 JULY 2019
Feeding time at the pilot plant

Feeding time at the pilot plant

The L-Max process turns out lithium carbonate from mica's like lepidolite and zinnwaldite.

Design / Build

27 JUNE 2019
L-Max plant on track for 2019

L-Max plant on track for 2019

The pilot plant will use small scale industrial equipment.

Design / Build

20 DECEMBER 2018