International Graphite's Collie facility also houses a thermal purification furnace.
15 September 2022
The bench scale pilot plant was fabricated by AMAR Equipment at its factory in Mumbai.
25 May 2022
Pilot plant modules arrive in port ready for Broken Hill transport.
02 March 2020
Feed to fully charge up the L-Max and S-Max circuits has come from the Alvarrões mine in Portugal.
18 April 2019
The 2578kg load was produced at the plant in October as part of the three-year pilot plant project.
04 February 2019
From flight schedules to emergency alerts, new screen-based platform Swift TV is helping mining companies better reach workers
THE BEST GET BETTER: the new Nexsys system
Boosting pipeline lifespan, cutting energy use, and lowering emissions in modern
Why the mining sector must move from incremental change to systemic reform in how it manages, monitors and mitigates tailings risk.
Discover how mining companies and investors are adopting, deploying and evaluating new technologies.
Gain exclusive insights into the world of exploration in a comprehensive review of the top trending technologies, intercepts, discoveries and more.
Mining IQ Future Fleets Insights 2025 looks at how companies are using alternative energy sources to cut greenhouse gas emmissions
Exclusive research for Mining IQ Automation and Digitalisation Insights 2024 shows mining companies are embracing cutting-edge tech