Primero stacks on with Thyssenkrupp

Primero stacks on with Thyssenkrupp

Primero gets South Flank stacker assembly contract from Thyssenkrupp.

Logistics

28 AUGUST 2019
Heat on after stacker fail

Heat on after stacker fail

Corrosion blamed for a WA fixed conveyor stacker failure.

Logistics

22 MARCH 2019
Civmec South Flank bound

Civmec South Flank bound

Civmec gets a fabrication order for South Flank

Development

01 MARCH 2019
Civmec cargo docks in Weipa

Civmec cargo docks in Weipa

A ship load of modules for Rio's Amrun mine makes safe Weipa landing.

Logistics

21 JUNE 2018