Aurizon volumes down on production issues

PRODUCTION and maintenance issues led to Aurizon railing less coal in 1H FY2020 than it did in the previous corresponding period.

sponsored-logo
Aurizon volumes down on production issues Aurizon volumes down on production issues Aurizon volumes down on production issues Aurizon volumes down on production issues Aurizon volumes down on production issues

Aurizon's coal transport numbers are down.

A total of 106.3 million tonnes of coal was railed in Queensland and New South Wales in the first half of 2019-20 compared to 106.5Mt in the first half of 2018-19.

 

Most read Infrastructure