The bath pilot batch reactor enhances process mixing
13 September 2023
Stantec's design aims to lower power and water use and eliminate grinding media
12 September 2023
The pilot plant is scheduled to be built in Perth
14 August 2023
The pilot plant will produce phosphoric acid as feedstock to purification processing
27 April 2023
Collie pilot plant can pump out high-quality spheroidised graphite.
19 October 2022
The $2.5 million pilot plant will run alongside the micro-plant to produce larger quantities of HPA.
19 August 2022
The pilot plant bath reactor will have capacity to process 20kg per hour of bath.
18 July 2022
A Q&A with Okane Consultants
SRK Consulting's Rob Bowell discusses mine closure and the valorization of mine waste.
Ecocene’s Ecoda powers smart, data-driven mine closure and ecosystem restoration
SES housing engineered for Australasia’s toughest applications
MMI Future Fleets Report 2025 looks at how companies are using alternative energy sources to cut greenhouse gas emmissions
Exclusive research for Mining Magazine Intelligence Automation and Digitalisation Report 2024 shows mining companies are embracing cutting-edge tech
The ESG Mining Company Index report provides an in-depth evaluation of ESG performance of 61 of the world's largest mining companies. Using a robust framework, it assesses each company across 9 meticulously weighted indicators within 6 essential pillars.
A comprehensive review of exploration trends and technologies, highlighting the best intercepts and discoveries and the latest initial resource estimates.