Bowen Coking Coal: 12 of 14

Data confirms Cooroorah extension and resources
EXPLORATION

Data confirms Cooroorah extension and resources

Average seam thicknesses range from approximately 2m for the Castor seam to 4m for the Mammoth seam.

03 April 2019

BCC to fast track Isaac River with $1.7M
SURFACE

BCC to fast track Isaac River with $1.7M

The project was drill ready and awaited only the availability of the drill rig to start drilling.

18 March 2019

BCC study positive for Isaac River Coal project
EXPLORATION

BCC study positive for Isaac River Coal project

The key focus areas of the study covered mine planning, operating cost, and capital expenditure.

11 March 2019

Bowen boosts Cooroorah resource estimate
EXPLORATION

Bowen boosts Cooroorah resource estimate

Analysis for the Mammoth seam suggested a high-quality coking coal product.

18 February 2019

Bowen ramps up Isaac River exploration
EXPLORATION

Bowen ramps up Isaac River exploration

The program would help obtain an understanding of the coal quality of the Leichhardt seam.

28 January 2019

Sneddon and Jorss appointed to Bowen board
MANAGEMENT

Sneddon and Jorss appointed to Bowen board

Jorss said Bowen has done a great job of aggregating a strategic position in the Bowen Basin.

13 December 2018

 Drilling at Bowen Coking Coal's Cooroorah project in Queensland.
EXPLORATION

Bowen drilling program finishes early

Core from the Mammoth seam in hole COR014 has been dispatched to the laboratory.

06 December 2018

Bowen drilling campaign off to a promising start
EXPLORATION

Bowen drilling campaign off to a promising start

COR014 is strategically located towards the east of the tenement.

19 November 2018

PARTNER CONTENT

Hastings Deering overhaul longwall mining equipment

With a dedicated workshop, the team is fully equiped to re-engineer underground longwall

PARTNER CONTENT

Emesent Hovermap riding high on UAVs, robots and automobiles

The underground mapping specialist explores new ways to map the inaccessible

PARTNER CONTENT

Tackling tailings risk with dewatered solutions

SRK is working to consider dewatered tailings management technology as a risk reduction

PARTNER CONTENT

Enhanced Safety and Visibility with BlastWeb II Technology

Dyno Nobel’s digital advancements bring a new era of secure underground blasting

A growing series of reports, each focused on a key discussion point for the mining sector, brought to you by the Mining Monthly Intelligence team.

A growing series of reports, each focused on a key discussion point for the mining sector, brought to you by the Mining Monthly Intelligence team.

editions

Mining Magazine Intelligence Future Fleets Report 2024

The report paints a picture of the equipment landscape and includes detailed profiles of mines that are employing these fleets

editions

Mining Magazine Intelligence Digitalisation Report 2023

An in-depth review of operations that use digitalisation technology to drive improvements across all areas of mining production

editions

Mining Magazine Intelligence Automation Report 2023

An in-depth review of operations using autonomous solutions in every region and sector, including analysis of the factors driving investment decisions

editions

Mining Magazine Intelligence Exploration Report 2023 (feat. Opaxe data)

A comprehensive review of current exploration rates, trending exploration technologies, a ranking of top drill intercepts and a catalogue of 2022 Initial Resource Estimates and recent discovery successes.