A multi-seam, 150m wide longwall with drift access to the Mammoth seam was assumed as base case.
20 August 2018
The total laboratory yield is estimated in excess of 90%.
17 July 2018
The open cut areas were confirmed as a priority for Mt Hillalong.
09 July 2018
The Mammoth seam has high yielding coal, according to analysis by BCC.
21 June 2018
Bowen completes acquisition of Hillalong East.
13 May 2018
Bowen sees promising future for Cooroorah.
29 April 2018
BCC is proceeding with a mining concept study for Cooroorah.
23 April 2018
The tenements are also well located to regional infrastructure.
12 April 2018
With a dedicated workshop, the team is fully equiped to re-engineer underground longwall
The underground mapping specialist explores new ways to map the inaccessible
SRK is working to consider dewatered tailings management technology as a risk reduction
Dyno Nobel’s digital advancements bring a new era of secure underground blasting
The report paints a picture of the equipment landscape and includes detailed profiles of mines that are employing these fleets
An in-depth review of operations that use digitalisation technology to drive improvements across all areas of mining production
An in-depth review of operations using autonomous solutions in every region and sector, including analysis of the factors driving investment decisions
A comprehensive review of current exploration rates, trending exploration technologies, a ranking of top drill intercepts and a catalogue of 2022 Initial Resource Estimates and recent discovery successes.