This article is 20 years old. Images might not display.
The survey, conducted by Velseis, totalled 50km of traverses over 12 lines about 3km apart using the MiniSOSIE method.
Cockatoo said this method had given “excellent resolution of the coal-bearing strata and geological structured had been identified”
The company will begin drilling to validate results this month. Drilling is scheduled to finish mid-March.
The Dingo project covers 28,270ha on the south-eastern flank of the Bowen Basin, with the northern boundary about 3km south of the Blackwater railway.

